
From drawings and samples, Towards a complete interior
Collaboration can start with a rendering, colour sample or plan. During design, we help compare materials, colours and laying patterns, using sampling to confirm physical appearance. Once the scheme is settled, translate dimensions, locations, quantities and edge requirements into the specific supply scope.
✦Bespoke services
01 — Applications
Floors
Let grain unfold across a more complete board face.
View products02 — Applications
Walls
Wood grain on a wall can extend from a single feature to a complete elevation.
View products03 — Applications
Ceilings
Extending grain overhead adds another material connection to the space.
View products04 — Applications
Stairs
Continue a coordinated wood-colour relationship between stairs and adjoining floors.
View products
✦Material selection and components
Samples confirm the intended design, while site conditions determine how it can be realised.
Narrow-board flooring
Fine strips add layers of lines to the floor.
Herringbone flooring
Rectangular boards interlock in a staggered herringbone arrangement.
Chevron flooring
Angled board ends meet to form continuous V-shaped lines.
Bespoke parquet flooring
Design wood colour, grain and geometric pattern together.
Versailles parquet
Pattern consultation.
Shaped parquet flooring
Begin floor design with the module outline.
Old wood boards
Material consultation.
Skirting and edge details
Floor boundaries also require material selection.
Solid wood flooring
Made from a single piece of natural wood, directly displaying the selected species' grain and colour.
Multi-ply engineered wood flooring
The solid wood top layer provides the grain, while the core forms the board construction.
HUAGE · Product and project information
The service process from selection to maintenance
Advance the project through material advice, order matching, delivery, installation and after-sales maintenance. Discuss materials, finishes, dimensions, colours and designs using physical samples.
Material advice
Start with application location, interior style, budget and site conditions, then confirm the wood top layer, construction, board format and pattern. Select separately for floors, walls, ceilings and stairs.
Order matching
Check product documents and the project schedule against the approved design, colour, dimensions and finish. Define bespoke requirements, quantities and delivery conditions when ordering. Names shown in the original catalogue are references for finding material; actual supply specifications are governed by the confirmed project information.
Delivery arrangements
Confirm deliveries and site entry against quantities, receiving location and site programme. Discuss production, delivery and installation timing per project; source ‘fast delivery’ is not a universal arrival deadline.
Installation coordination
Before installation, check the subfloor conditions, moisture-control treatment, board construction, laying method and edge details, then arrange the site works. The company materials describe nationwide installation visits in mainland China and an installation team in Hong Kong. Specific locations, programmes, charges and project arrangements are established when the service is agreed.
After-sales maintenance
Explain routine care against finish and environment. For issues, check product, site condition and handover records, then act as agreed. Define service scope, charges and warranty conditions in project documents.
HUAGE · Product and project information
Installation methods and construction checks
The original catalogue lists timber-batten, floating, full-spread glue-down and adhesive-bead systems. Selection depends on construction, joints, subfloor and environment. The following supports proposal discussions.
Timber battens
Listed for solid wood flooring and other applications: prepare moisture control and timber battens before laying boards. Confirm construction height, fixing methods and perimeter movement allowances for the actual assembly.
Floating installation
Listed for all-birch plywood core and three-layer engineered wood: use underlay with the corresponding click-lock or tongue-and-groove installation, checking subfloor dryness, moisture-layer continuity, perimeter allowances and intermediate movement spaces.
Full-spread glue-down
The materials list parquet, solid wood, multi-ply and three-layer applications. Check subfloors, primers, adhesives and application methods. Confirm open time, coverage and curing time for the actual selected system.
Adhesive-bead installation
The materials list all-birch plywood core, three-layer and new three-layer constructions, fixed with adhesive beads. This application list does not mean the directory provides a distinct current product for new three-layer construction.
Pre-installation checks
Check soundness, flatness and dryness, cracking, softness and dusting; check moisture-control treatment near balconies, kitchens, bathrooms and basements. Define subfloor tests and acceptance conditions in the installation proposal.
Installation and handover
Open and trial-lay, approving colour and transitions before installation. Follow the proposal for cut ends, wall movement gaps and edges, checking looseness, noise and bonding at stages. A seamless appearance still requires the movement space demanded by the build-up.
HUAGE · Product and project information
Delivery, warranty and subsequent maintenance
Keep confirmed material and installation information in the project documents to support routine care, investigation and after-sales communication.
Handover approval
Check appearance, laying effect, joints and edges against approved samples and schedules, confirming site inspection results and care. Agreed products and installation proposals define tolerances and acceptance methods.
Warranty scope
The original materials state a '20-year flooring warranty'. Applicable products, warranty provider, starting date, coverage of construction, finish and installation, exclusions, labour and transport costs are governed by the relevant product's written warranty terms.
Use and maintenance
Follow care instructions for the actual timber, finish and service environment. After-sales maintenance does not imply free, lifetime or fixed-duration service; the relevant arrangements must be agreed for the project.
HUAGE · Original catalogue references
Installation and junction documents
Drawings communicate material construction, installation and connections. The project contractor confirms the specific method using drawings, materials and site conditions.